Restructure kitchen:
Add bay window, larger window over new sink, new cabinets, washer/dryer area, copper piping (kitchen plumbing,) hardwood flooring.
1990 Carrier 2 1/2 ton remote central A/C & Heating System, servicing upstairs only.
2003 New Roof
2003 Replace Cast Iron Sewer pipe under house with ABS (clean out close to front steps.)
New 4" pipe from toilets, 2" from showers & tub, 1 1/2" from vanities.
2005 New Water Heater with earthquake strap.
2009 $100, 000 Foundation work: 30" diameter Caissons sunk into bedrock. Steel Beams, with rebar, connect Caissons and girdle the house. Beams bolted to foundation. New paths (steps) around sides of house. New Patio off kitchen.
2009 Tear down chimney to throat, rebuild
Installed new Spark arrestor, Chamber, Damper.
New Gas Supply Valve under house to fireplace.
Parkstone hearth and surround.
2009/2010
New Kitchen Tile
New French Doors in Sitting Room
Remodel all 3 Bathrooms with new fixtures, cabinets, flooring.
New Path to front door (Boston Brick and Stone.)
2010 New Washer & Dryer
2010 installed recessed lighting in Sitting Room
2011 New Metal Flashing around Dormer Windows in Roof